Episode 11998-09-07

Accessible Home: Housing Project Introduced

In a neighborhood outside of Boston, work begins on an affordable housing unit for a person with disabilities. Included: soil decontamination and foundation excavation.

Episode 21998-09-14

Accessible Home: Framing and Shingling

Asphalt shingles and flashing are added to the roof, and walls are prepped with special blocking for mounting safety handrails. Also: tips on paneling and working with a culturally diverse crew.

Episode 31998-09-21

Accessible Home: Installing Siding

A special weather- and fire-resistant siding is installed. Also: finishing the basement work and running electrical wiring.

Episode 41998-09-28

Accessible Home: Insulation and Door Installation

Insulation work is begun and trenches are dug for the new water service. Also: Boston Mayor Thomas Menino stops by to help install the front door.

Episode 51998-09-28

Accessible Home: Designing for the Disabled

Bob Vila talks with experts to understand the difference between adaptability and accessibility when designing homes for disabled people.

Episode 61998-10-12

Accessible Home: Building the Railing System

The railing system is built and integrated with the front porch columns. Also: a tour of Boston's Roxbury community, making a comeback from urban blight.

Episode 71998-10-19

Accessible Home: Building the Railing System Stairs

Landscaping begins, the modular stair system is anchored, and the front porch ramp is built.

Episode 81998-10-26

Accessible Home: Installing a Tankless Water Heater

Recessed lighting and a cost-effective tankless water heater are installed. Also: a tour of a lighting manufacturing plant.

Episode 91998-11-02

Accessible Home: Shower Stall and Drywall

Drywall goes up and plumbing begins on a shower stall designed for wheelchair users. Included: a field trip to learn about new trends in community living.

Episode 101998-11-09

Accessible Home: Accessible Fixtures and Elevator

The elevator is put in, and bathroom fixtures are installed along with hardware specially designed for people with disabilities.

Episode 111998-11-16

Accessible Home: Energy Efficiency Discussion

The energy-efficient boiler is installed, and Bob Vila heads to Germany for a tour of the plant where the boiler was made.

Episode 121998-11-23

Accessible Home: Lockset Installation

A specially designed lock set is installed, along with an energy-efficient, side-by-side washer-dryer.

Episode 131998-11-30

Accessible Home: Accessible Unit Tour

Bob Vila tours the completed unit, paying special attention to the wheelchair-accessible kitchen with energy-efficient appliances.

Episode 141998-12-07

Loft Conversion: Loft Conversion Initial Tour

Conversion of an old fur storage building into a residential loft begins in Boston's Leather District. Included: a walking tour of other well-preserved antique commercial buildings in the neighborhood.

Episode 151998-12-14

Loft Conversion: Plumbing, Heating and the 'Big Dig'

Installation of plumbing and heating begins. Included: a look at the progress of Boston's famous highway project, the 'Big Dig'.

Episode 161998-12-21

Loft Conversion: Plastering the Loft

Plastering is begun on the project, while Bob Vila takes a trip to Cambridge to meet a landscape architect who converted an industrial building into a spacious home and office.

Episode 171998-12-28

Loft Conversion: Elevating the Kitchen and Bedroom

A platform is built to raise the kitchen and bedroom above floor level. Included: a visit to a nearby finished loft.

Episode 181999-01-04

Loft Conversion: Paint and Plate Glass Windows

The entryway and foyer are painted, and the plate glass windows are replaced throughout. Work on the bathroom begins with shower tile installation and lavatory plumbing.

Episode 191999-01-11

Loft Conversion: Framing a Wall With Built-in Cabinets

Bob Vila addresses the challenge of framing and plastering a 48-foot wall with an almost imperceptible curve. Plus, built-in cabinets are constructed.

Episode 201999-01-18

Loft Conversion: Installing Plumbing Fixtures

The bathroom progresses with the installation of an electrically powered full-body shower tower, a dual-speed pressurized toilet, and a glass lavatory.

Episode 211999-01-25

Loft Conversion: Installing Stainless Steel Countertops

Installation of the restaurant-style kitchen is begun, and Bob Vila tours the fabrication shop where the steel materials being used were custom-made.

Episode 221999-02-01

Loft Conversion: Drywall and Plastering Tips

Bob Vila offers tips on installing precision drywall and plastering in tricky places. Plus, a bookshelf nook is built and stainless steel appliances are installed.

Episode 231999-02-08

Loft Conversion: Installing Track Lighting

Finishes are installed in the bathroom and elsewhere in the loft, track lighting is put in. Included: a tour of Lightolier's Tech Center to learn about the power of light to change the mood of a space.

Episode 241999-02-15

Loft Conversion: Building a Closet System

Architect Greg Rochlin is on-site to oversee the fabrication of the hallway closet system-- a multicolored design pieced together in Formica laminate. Lighting designer Markus Earley returns with some snazzy fixtures and controls, and the stackable Maytag washer/dryer unit is installed in the closet.

Episode 251999-02-22

Loft Conversion: Kitchen Work and Shutters

Work on the restaurant-style kitchen continues, as the wire shelving system is built and the stainless steel range hood is installed.

Episode 261999-03-01

Loft Conversion: Loft Conversion Final Tour

A tour of the completed conversion project begins with the building's restored facade and ends with the sixth-floor residential loft.