EpisodeS16E61994-02-28

This Old House

The Acton House - 6

The framing crew continues working on the addition; a large steel beam to carry out the upper floor is lowered into place. A framer demonstrates a pneumatic tool for attaching metal hangers to wood. The guys lay down the second floor deck, using construction adhesive and tongue and groove plywood. Inside, we find Terry Maitland putting in a footing for the missing basement lally column. We then meet a lead paint inspector, who uses an x-ray machine to gauge the presence and concentration of lead paint in the old building. Tom Silva works on replacing the rotten and underframed back of the old building. We meet a lightning protection inspector from Underwriters Labs, who assesses the building's system.

My Thoughts
Guest Stars
Special appearances in this episode.

Guest Stars

No guest stars available.

Crew
Episode-specific crew credits.

No crew data available.

Videos
Clips and promos for this episode.

Videos

No videos available.

Stills
Episode still images from TMDB.

Stills

No still images available.