EpisodeS16E41994-02-01

This Old House

The Acton House - 4

We tour the newly demolished back areas of the house, and see how woefully underframed they are. In preparation for the new foundation, the crew suspends the gable end of the old house with ""pins"" of engineered lumber supported both inside and outside the building. Herb Brockert removes part of the old rubblestone foundation, and a small-batch concrete delivery truck pours footings for the addition's lally columns. Steve revisits the Gallants' Victorian to see how they're liking it. A few days later, a performed concrete foundation system arrives on site and is swung into place with a crane. Soon, a transit truck arrives and the crawlspace gets a slab as part of the foundation system.

My Thoughts
Guest Stars
Special appearances in this episode.

Guest Stars

No guest stars available.

Crew
Episode-specific crew credits.

No crew data available.

Videos
Clips and promos for this episode.

Videos

No videos available.

Stills
Episode still images from TMDB.

Stills

No still images available.