InterCity Norwich poster
Movie199790 minReleased

InterCity Norwich

With a top speed of 100 mph, the hourly InterCity trains normally cover the 115 miles between the capital of East Anglia and London's Liverpool Street Station in well under 2 hours. One feature of note is the single line swing bridge built at the time of electrification to Norwich in 1987. It is one of only a handful of operational swing bridges in the world provided with overhead line equipment. Our InterCity express calls at Diss, Stowmarket and Ipswich. South of Ipswich, Anglia trains are joined by those of GER, and at Colchester by Clacton services - all squeezed onto just two tracks signalled for bi-directional working. Relief comes at Shenfield where the Southend lines provide an additional pair of tracks. With freight traffic to Felixstowe and Harwich a wide variety of trains rush past.

Documentary
My Rating
Sign in with TMDB to save ratings to your account.
Language
EN
Original release language
Production
Video 125
Lead production company
Scope
90 min
Total runtime
My Thoughts
Cast
Top billed cast from TMDB credits.
Crew
Key crew roles and departments.
Videos
Trailers, teasers, and clips.
Images
Backdrops and posters from TMDB.
Ratings
Audience score and available content ratings.

TMDB Score

0.0

from 0 ratings

Certification

N/A

Preferred region-based rating

Homepage

Visit official site

External official link